Bilge got the two remaining paint layers on top of Zinga and its top layer Alufer. I have planned to paint the whole inside hull with the same combo, but before that the hull needs to be sanded totally. I need to figure out who would be the right person to do it:)

In addition to the painting job, also the thrust bearing and it’s mounting plate is installed. Took some time to get the mounting angle of the mounting plate right, but it feels like it is in the right position. Now only the Pythondrive joint and gearbox are missing, when those are in place, the power line is ready.