Monitoring stuff

The switch panel has some more parts in it. The main water and main fuel tank have now gauges to show how full they are. Makes life easier! There is 12V outlet for the icebox, and the red and green lights tell the status of thruhull valves. Red=open and green=closed. Water tank sender in place […]

Read more


More bilge painting

Bilge got the two remaining paint layers on top of Zinga and its top layer Alufer. I have planned to paint the whole inside hull with the same combo, but before that the hull needs to be sanded totally. I need to figure out who would be the right person to do it:) In addition […]

Read more


Seawater pump in place

The seawater pump finally changed from an electric pump to a belt drive. The biggest problem was where to place it, in the end suitable and the only such place was found under the charger. To do that, I had to make a mounting piece that I bolted to the front mounting bracket of the […]

Read more


Making a hatch to the bottom of the cockpit

Since the power line had a thrust bearing on the propeller shaft, I decided to make a hatch to the bottom of the cockpit. Without the big hole in the bottom of the cockpit, there should have been a renovation in the tipping position at the end of the engine room which didn’t sound fascinating […]

Read more